applications
  • nederlands
  • Deutsch
  • contact
  • home
ground settlement

  • Selection of compensators waste water installations, ground settlement on underground piping
  •  
  • General:
  • In pump stations and waste water treatment plants underground piping is often used. But where piping
  • is attached to piled buildings and basins, stress in the piping occurs when, due to ground settlement,
  • the piping moves vertically down.
  • Depending on the type of soil and the manner of depositing the different layers of soil, larger or smaller
  • ground settlement occur.
  • One of the possibilities to compensate this settlement is the installation of compensators near the
  • wall penetration. In many cases the joint is to be tied: the compensator is than forseen with tiebars
  • or hinges. In order to be able to configure these brackets the maximum working and/or test conditions
  • should be specified.
  •  
  • Another possibility is to install a Performer rubber pipe. The Performer type AD 10 H is suited for
  • underground installation. A longer pipe can cater for bigger ground settlement.
  • Mounting with flange couplings, e.g. PN10.
  •  
  • Selection:
  • - DN 32 - DN 450
    : Dilatoflex® series T rubber quality GZDilatoflex T GZ
  • - DN 500 - DN 3000
    : Dilatoflex® series N rubber quality GZDilatoflex N GZ
  • - DN 40 - DN 2000
    : Performer® AD 10 HPerformer
  •  
  •  
  •  
  •  
  •  
  •  
  •  

  • Hibro Compensatoren bv
  • All rights reserved